“I am, therefore, pleased to witness this strategic investment, which demonstrates the government's commitment to strengthening road infrastructure maintenance and improving service delivery to the Zambian people,” Hon. Eng. Nzovu said.
He said he was happy that the RDA under phase 1, had procured 67 pieces of road maintenance and sealing equipment at a total cost of K138.3 million.
The equipment includes, among others, tipper trucks, road line marking machines, vibrating rollers, mobile combine chip spreader and bitumen distributor.

The equipment is split into two sets and the first set will be stationed on the Great East Road between Chongwe and Rufunsa, and the second set will be stationed along the Great North Road between Serenje and Mpika. The equipment is scheduled to be distributed to these places within a week from now and maintenance works are expected to commence immediately.
“This investment reflects government's determination to strengthen in-house maintenance operations, in order to also build capacity of the Road Development Agency. In phase 2, the Road Development Agency will procure the earthmoving machines.
“The commissioning of this equipment is aligned with the Government's infrastructure development agenda and the broader aspirations of the Grow Zambia Agenda.
“As we all know, roads are the arteries of our economy. They connect farmers to markets, manufacturers to consumers, tourists to destinations, and communities to essential services. Without a functional road network, economic growth becomes difficult to attain,” Hon. Eng. Nzovu said.
Hon. Eng. Nzovu said the true value of the investment will depend on effective management, regular servicing, skilled operators and strict adherence to safety and operational standards.
He urged all officers entrusted with the assets to ensure that they are managed responsibly and professionally.
“These machines represent a significant public investment and must be utilised efficiently for the benefit of the nation,” Hon. Eng. Nzovu said.

RDA Board Chairman, Eng. Eugene Haazele said the Commissioning Ceremony represented a significant milestone in the Agency’s efforts to strengthen its operational capacity, enhance road maintenance delivery and ensure the long-term sustainability of Zambia’s road infrastructure.
“It also demonstrates our commitment to improving the condition of the country’s road network in support of national development and the Grow Zambia Agenda. The RDA recognizes that a well-maintained road network is fundamental to economic growth, improved connectivity and efficient movement of people, goods and services.
“In this regard, the Agency has adopted a strategic principle which states that: ‘All roads in good and fair condition should be placed under maintenance’,” Eng. Haazele said.
Eng. Haazele said this principle underscores the RDA’s determination to give maintenance the priority it deserves, while ensuring that existing road infrastructure is preserved and protected from premature deterioration.

“We are therefore placing greater emphasis on preventive, routine and periodic maintenance to ensure that roads remain in serviceable condition and continue to support economic activities across the country,” he said.
Eng. Haazele said despite the importance of road maintenance, the sector had continued to face significant challenges, particularly those arising from financial constraints.
He said the limitations have affected the timely implementation of maintenance programmes on various sections of the core road network.
“It is against this background that the RDA has taken deliberate steps to strengthen its capacity to undertake maintenance works more efficiently and respond promptly to road infrastructure emergencies,” he said.

.webp)