Archive for category: Uncategorized

Untitled (39)

UPDATE ON CONSTRUCTION WORKS OF THE LUSAKA-NDOLA DUAL CARRIAGEWAY

Works to upgrade to dual carriageway the Lusaka-Ndola Road have recorded physical progress of 17.8% while 88.6% has been attained on the 45 kilometres...

Read More 0
Untitled (36)

EIZ CONDUCTS A TECHNICAL AUDIT ON LUSAKA-NDOLA DUAL CARRIAGEWAY

…emphasizes on engagement of an independent Engineer The Engineering Technical Committee has undertaken an audit on the Lusaka-Ndola dual car...

Read More 0
awards

RDA BAGS TWO TOP AWARDS AT THE 2024 ZAMBIA INTERNATIONAL TRADE FAIR

The Road Development Agency (RDA) has scooped two awards at this year’s Zambia International Trade Fair (ZITF) in Ndola. The Agency got the f...

Read More 0
Untitled (18)

CONSTRUCTION OF CHIBILA CULVERTS IN MUMBWA DISTRICT COMPLETED

The Road Development Agency (RDA) has completed the construction of Chibila box culverts in Mumbwa District in Central Province. Chibila Community ...

Read More 0